Loader gif
Korelate Logo

Korelate
Typically replies within an hour

Korelate
Hi there 👋

How can I help you?
×
Chat with Us Quick Enquiry

Build A Roller Coaster

Activity Information

Duration
90 Minutes
Group Size
20-400
Options
Indoor + Outdoor

Learning Outcomes

A lot goes into building a rollercoaster that requires the team members to collaborate and work together to align their objectives with the big picture. Seeing the big picture will help participants break down silos in the organization and encourage teamwork among themselves.

Experience the activity

Teams are tasked with the challenge of building a functional roller coaster with the few basic materials provided. The roller coaster should be built such that a ball should be able to travel through the entire course and stop at the end using no external forces but gravity. The team that builds the best roller coaster will be declared the winner.

Alternatively, the finale could involve joining all the roller coasters together to build one large roller coaster through which the ball must travel right from the starting point of the first roller coaster to the ending point of the last one.